Three Brothers

Three Brothers A Group of Professional - Electrical Engineers - who are willing to train you to be professional in your field
#تابعونا

17/08/2019

Transformer site tests

1. Visual inspection.
2. Insulation resistance test.
3. Tan Delta test (Dielectric loss test).
4. First operation of on load tap changer (OLTC)
5. Turns ratio test.
6. Vector group verification.
7. no – load current test.
8. Winding resistance test.
9. Function test & Scheme check.

Voltage drop
15/02/2018

Voltage drop

Transformer
15/02/2018

Transformer

تصميم اعمال القوى  # الكود المصرى
14/02/2018

تصميم اعمال القوى
# الكود المصرى

Distribution panel
14/02/2018

Distribution panel

Hospital Loads
13/02/2018

Hospital Loads

LUMINAIRE WITh BATTERY
12/02/2018

LUMINAIRE WITh BATTERY

Road Lighting in simple form
12/02/2018

Road Lighting in simple form

12/02/2018

#مشروع التخرج
لو حد محتاج حاجة ياشباب ان شاء الله نقدر نساعدة

Address

Cairo

Alerts

Be the first to know and let us send you an email when Three Brothers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share